Construction, Schedule, and Cost Engineer-Responsible for cost and schedule control of the $40 million United States Embassy construction project. Responsible for processing shop drawings and compiling and documenting acceleration claim on the construction. Estimated over a million dollars of contract changes including an accelerated change order that resulted in cost savings of over a half-million dollars and a time savings of over two months for the Government. I was also responsible for computer network maintenance, project quality control, and overall supervision (labor and materials) of construction in the classified and unclassified areas of the project.